PLP MILTON KEYNES, PHASE 2

M1 J13/14

Arial shot of phase 2
DESIGN & BUILD OPPORTUNITY
Arial shot of phase 2
DESIGN & BUILD OPPORTUNITY
DESIGN & BUILD OPPORTUNITY

THE OPPORTUNITY

Phase 2 at PLP MK is a 44.7 acre industrial and logistics development site which is fully serviced and benefits from unrestricted outline planning consent providing up to 1.15 million sq ft. The highly flexible site is ready to deliver design an build options for occupiers.

 

Phase 2 also benefits from two Reserved Matters Consents providing immediately deliverable and highly flexible options. Option 1 is a multi-unit scheme of 226,000 sq ft, 258,000 sq ft and 502,000 sq ft. Option 2 is for a single unit of 961,000 sq ft.

 

PLP MK is a brand new, modern business park environment offering market-leading ESG credentials. It is the first industrial and logistics business park of this scale in the UK, to be delivered carbon net zero in construction. It benefits from arguably the best leisure and amenities in the market. The business park environment and proximity to Milton Keynes city provides customers with an outstanding working environment.

Arial shot of phase 2

Location

PRIME SOUTH EAST 2.2 MILLION SQ FT
LOGISTICS BUSINESS PARK

Totalling 135 acres, PLP MK is a market-leading South East, industrial and logistics business park. It is strategically located 32 minutes north of the M25, near the logistics market golden triangle. PLP MK is connected to the city of Milton Keynes, with benefits that include immediate proximity to the motorway network, four railway stations and the world class amenities of the city.

These geographic and economic attributes provide occupiers of PLP MK with a best-in-class working environment.

Drive Times

DriveTimes

Origin Miles Time
M1 J14 6 miles 10 mins
M25 28 miles 32 mins
Central London 49 miles 1 hr 10 mins
Birmingham 73 miles 1 hr 28 mins
Leeds 149 miles 2 hr 40 mins
Manchester 154 miles 3 hrs
Origin Miles Time
London Luton 20 miles 26 mins
London Heathrow 49 miles 50 mins
London Stansted 54 miles 1 hr 15 mins
Birmingham 65 miles 1 hr 18 mins
East Midlands 71 miles 1 hr 20 mins
London Gatwick 91 miles 1 hr 35 mins
Origin Miles Time
Bow Brickhill 0.7 miles 2 mins
Milton Keynes Central 5.2 miles 8 mins
Bletchley 2.7 miles 7 mins
Fenny Stratford 1.2 miles 3 mins
Origin Miles Time
Tilbury 74 miles 1 hr 15 mins
London Thamesport 95 miles 1 hr 40 mins
Southampton 111 miles 2 hr 10 mins
Felixstowe 115 miles 2 hrs
Immingham 151 miles 2 hrs 30 mins
Liverpool 172 miles 2 hr 50 mins

Siteplan

Illustration of top down view

Sustainablity

PLP MK, Phase 2 will be built to the PLP environmental standard, incorporating a range of eco-conscious features that will both benefit our planet and enhance the lives of those visiting and working at the site.

  • Tree and leaf icon

    £1.2 MILLION

    Bio-diversity offsetting contribution – habitats in accordance with the
    Milton Keynes Biodiversity
    Offsetting Scheme

  • Solar power icon

    SOLAR

    Green future proofing to
    allow occupiers to install
    up to 100% PV roof coverage

  • Flowers icon

    17 ACRES

    The creation of 17 acres of lowland meadows and investment in public
    open spaces across the town

  • Public art gallery

    £250,000

    Investment in public art

  • Bus stop icon

    BUS STOP

    On-site bus stop
    plus investment in improvements
    to local bus routes

  • Steel beam icon

    £1.66 MILLION

    Carbon offset contribution
    in line with the council’s sustainable Contribution Supplementary Planning Document (2007)

  • Trowel icon

    9.4 ACRES

    Archaeological
    protection

  • Public access icon

    3.8 KM

    Pedestrian and cycle access, integrated into
    the Milton Keynes Red
    Way cycle network via
    the estate spine road

  • Cycle icon

    CYCLE PATHS

    Extensive on-plot
    provision for cycle
    storage, maintenance
    and showering facilities

  • EV charging icon

    EV CHARGING

    3.8 KM Electric vehicle charging points throughout the scheme

  • Ecology

    ECOLOGY

    Ecological protection
    and mitigation for
    reptiles, bats, badgers,
    nesting birds and
    the watercourse

  • Community

    COMMUNITY

    Supporting the community with financial investment in social and emergency services

Downloads

CONTACT THE MAIN AGENTS