SQ M | SQ FT | |
---|---|---|
WAREHOUSE | 27,409 | 295,029 |
OFFICES | 1,392 | 14,979 |
PLANT DECK | 64 | 694 |
GATEHOUSE | 23 | 248 |
TOTAL GIA | 28,888 | 310,949 |
18 m
50 m
32
4
318
56
40
PLP MK 310 has been built to the PLP environmental standard, incorporating a range of eco-conscious features.
car park designed to accommodate
full EV installation*
high-level roof drainage
system for rainwater recovery
all timber sourced from sustainable stocks
for energy and utility consumption
for solar PV panels
reducing the need for artificial lighting
and shower facilities
by incorporating materials and products with reduced embodied carbon
such as cement alternatives in concrete and structural steel with a minimum 20% recycled content
beyong requirements with a further 20% using onsite energy saving innovations